Excavation Plant Development

MCI delivered two completely overhauled and modernised mining plants from the excavation side over 10km conveying to the dumping side. No one else dared to overhaul and run a whole used plant of this size up to this point due to its complexity. MCI delivered, assembled and commissioned two of them at once! This is WORLD RECORD! To get achieve our goal and satisfy our customer, huge cultural, logistical and technical obstacles needed to be overcome. This included amongst other things a sea transport from an island and the capacity upgrade to adapt one spreader for two bucket wheel excavators. Due to our great staff we could manage to run a line within 6 Months.

A whole new mining was raised from scratch and therefore detailed planning was required. MCI did the whole electrical planning and mining engineering for the customer and is now operating two plants.

Facts:
2 Belt Wagons
2 Bucket Wheel Excavators
10km Conveyor
1 Spreader
Material: gravel, sand

Scope of work

Checking the stock of machinery
Overhaul and repair of all mechanical, electrical and hydraulic components.
Modernisation of machinery
Automation and Software optimisation
Delivery and transport
Assembly
Commissioning
Ramp up and Performance testing
Training of Operators
Spare and Ware Part Service
Operation and maintenance of two mining plants
Mining engineering for two mining plants